pilotsutilitiesfinland

Finnish utility pilots: who we are looking for

Who should request a SubLay C pilot, what a pilot pack includes, and how to use the pilot request form.

Yalda Biyabani

Yalda Biyabani

Head of Commercial

Nordic distribution landscape with buried foundation context, ready for a controlled first placement conversation
Nordic distribution landscape with buried foundation context, ready for a controlled first placement conversation

Year 1, SubLay is looking for Finnish electricity distribution partners and the civil contractors who place for them. The goal is controlled first placements of SubLay C Form 1: engineered protective backfill around buried foundations, with a practical monitoring plan on each pilot.

Pilot scoping kit with mineral sample, notebook, and measuring tape
Pilot scoping kit with mineral sample, notebook, and measuring tape

Who we want to talk to

Distribution system owners (DSOs) and related asset owners who bury and maintain reinforced concrete in aggressive ground: pole foundations, substation foundations, cable chambers, and similar assets. Coastal, sulfate-bearing or acidic soils, and salt-loaded roadside environments are the problem set Form 1 is built for.

Civil contractors who already dig and backfill those foundations. You do not need a new specialty crew. You need a clear thickness, compaction, and QC note you can run on a normal day.

Road and bridge teams are a sensible conversation after the electricity-distribution focus and independent EU laboratory work are further along. We still welcome early contact if your site fits, but Finnish DSO foundations are our first focus.

Good first-pilot traits: Finland, accessible for visits, a low-risk asset (not a critical single-point failure), and a buyer willing to allow monitoring and later anonymised learnings. We qualify every lead; not every enquiry becomes a first placement.

What a pilot pack includes

A SubLay C pilot pack is scoped per project. In plain terms it includes:

  • Material: SubLay C Form 1 for the agreed contact zone, with lot ID and grade (virgin-mineral when the placement needs it).
  • Application guidance: placement steps, thickness intent, compaction and QC notes your contractor can follow.
  • Monitoring plan: practical baseline and follow-up (for example lot and thickness records, photos, and optional half-cell or sampling where the buyer allows).

Tonne supply for ongoing Form 1 delivery comes after a successful pilot conversation, with logistics planned around your contractor. Pricing is agreed in the quote for your project.

A pilot request is an enquiry, not an order. We review asset type, region, timing, and decision-makers, then propose scope if it fits.

How to request a pilot

Use the pilot request form. Fill in name, organisation, role, email, and the basics of the asset: type, location, and any timing you already know. Add a short message if you have constraints (winter window, monitoring limits, virgin grade preference).

Consent on the form covers contact about pilots under our privacy notice. After submit you land on a confirmation page; our team reads every enquiry and follows up.

You can also start from the SubLay C product page if you want the placement story and validation table first, then jump to Request a pilot.

If you own or place buried foundations in Finnish distribution networks and want a soil-side protective bed in scope, request a pilot. Tell us the asset, the region, and when the trench opens. We will reply with whether it fits a first controlled placement and what the pack would include.

Next step

See SubLay C or start a pilot conversation.

Discussion

Comments

Ask about placement, pilots, or product framing. Comments are public; we may reply from the SubLay team.

Leave a comment

Name and comment are shown publicly. Email stays with the SubLay team.

No comments yet. Be the first to start the thread.

Keep reading

More from the blog

Same pale mineral system shown as loose bedding first, with precast tile and cast formats only as quiet roadmap objects

Forms 2 and 3: what comes after backfill

Form 1 is available to pilot today. Forms 2 and 3 extend the same material system into precast tiles and cast formats on the roadmap.

Arash Falah