Product

SubLay C

Form 1 ready to pilot

Protect buried concrete without changing the mix.

SubLay C turns ordinary backfill into a mineral corrosion shield around buried reinforced concrete, without changing the mix design.

Mineral protective bedding for buried reinforced concrete

Why SubLay C

Durability that fits how you already build.

SubLay C Form 1 is engineered protective backfill for the buried sides and base of reinforced concrete. Forms 2 and 3 use the same material system in precast and cast formats.

Other products protect the steel, the concrete mix, or the concrete surface. SubLay C treats the soil that attacks them.

No mix-design change

Keep your concrete recipe and structural design. SubLay C works in the soil contact zone around the asset.

Fits a normal foundation day

Place, compact, and backfill with clear thickness and QC guidance your contractors can follow.

Built for aggressive ground

Designed for the chloride, sulfate, and moisture exposure that eats ordinary backfill, including acidic sulfate-bearing coastal ground and salt-loaded roadside soils.

Protective by design for wide networks

A mineral bed meant for many buried assets, so durability work does not trade off against a clean contact environment around the structure.

Pilot with a monitoring plan

Start with a pilot pack: material, application guidance, and a practical monitoring plan.

How it works

Place a mineral shield. Keep your mix design.

Place SubLay C Form 1 around the sides and base of poles, foundations, and other buried elements. Ordinary soil stays outside that protective bed.

Above groundRegular soilRegular soilSubLay C Protective bedConcretestructureGround level

Cross-section: SubLay C sits around the buried part of the concrete structure so it does not sit directly in regular soil.

  1. 01

    Prepare the contact zone

    Clear and prepare the contact zone around the buried part of the concrete structure.

  2. 02

    Place SubLay C Form 1

    Place SubLay C around the sides and base of the submerged structure at the agreed thickness.

  3. 03

    Compact

    Compact to the civil specification agreed with your team.

  4. 04

    Backfill remaining zones

    Fill the rest of the trench with regular soil around the SubLay C bed.

  5. 05

    Monitor on pilots

    On pilots, install monitoring points and record lot ID, thickness, and date.

Delivery forms

One material system. Three delivery forms.

Available to pilot

SubLay C Form 1: engineered protective backfill

Loose mineral bedding for poles, foundations, and other buried elements. Replace ion-contaminated soil next to the structure.

Coming soon

SubLay C Form 2: precast biscuit / mosaic tiles

Precast tiles from the same material system for structured contact layers.

Coming soon

SubLay C Form 3: concrete cast from the produced soil

Cast use of the material system where a poured protective layer fits the design.

What is in Form 1

  • Mineral / silica-based matrix
  • Corrosion inhibitor and hydrophobic agents
  • Industrial side streams where regulation permits
  • Virgin-mineral grade available when you need it
  • Placement guidance and QC with every delivery

How we supply

  • Controlled blending and delivery to your site
  • Virgin-mineral grade available for placements
  • Circular feedstocks where local rules permit

Who it is for

Asset owners and the contractors who place for them.

Electricity network owners

Protect pole foundations, substation foundations, and cable chambers without redesigning concrete.

Civil contractors

Add a clear protective layer to foundation work with thickness, compaction, and QC you can run on site.

Road and bridge teams

Protect salt-exposed substructures where the ground drives corrosion risk.

How to buy

SubLay C pilot pack

Per project

Material, application guidance, and a monitoring plan sized to your site.

SubLay C Form 1 supply

Tonne delivered

Ongoing supply after a successful pilot, with logistics planned around your contractor.

Validation

Validation status.

Independent testing and conformity status for SubLay C.

  • SubLay C Form 1 product and placement method

    Clear placement around the buried structure. No change to the concrete mix design.

    Ready
  • Independent EU laboratory programme

    Third-party testing with an accredited laboratory. Results shared when published.

    In progress
  • Utility and contractor pilots

    Taking requests for poles, foundations, substations, chambers, and other buried concrete.

    Open for partners
  • Construction-product conformity

    CE conformity route for the material.

    Coming soon
  • Circular feedstock qualification

    Virgin-mineral grade available for current placements.

    Coming soon

Need a site-specific dossier? Request a pilot and we will outline the evidence for your asset.

Ready to pilot SubLay C on your site?

Tell us about the asset and region. We will follow up with next steps for a pilot pack.